BT LogoBT Price List

Section 47:VPN Services

Part 2:IP Clear and FrameStream and CellStream Connections


Subpart 4:IP Clear Pricing

Product Description

IP Clear is a wide area Internet Protocol (IP-VPN) service for the UK market designed to service customers who require connectivity between branches, data centres and operational sites throughout the UK.

IP Clear is an unbundled product. A router is required to deliver the solution.

IP Clear Service is available only to those customers who meet the IP Clear eligibility criteria.

IP Clear is available on a range of contract terms.

The level of ServiceCare is TotalCare (see Section 14 Part 1).

IP Clear Eligibility

Customers must commit to meeting or exceeding the qualification criteria set for IP Clear by the first anniversary of their Contract.

Description of Charges

IP Clear charges consist of :-

  • -An Access Connection charge (`Connection Charge') is a one off charge payable upon successful installation.
  • -An annual access rental charge (`Annual Rental Charge') is also applicable to all access types. The Annual Rental Charge is payable quarterly or annually in advance. All Access Connections are subject to a 12 month minimum Contract Term.

Prices for the Service will normally be governed by the location of the Service Point nearest to the Customer's Site. The Customer can request to be served from a different Service Point, which may result in an additional Out of Area charges (details of which are contained in this Part). BT reserves the right not to accept such requests.

Site Connection and Annual Rentals

Connection Charges





Access Connection Bandwidth

Site Connection Charge (a)

Exc VAT

Inc VAT

£

£

128 Kbps

750.00

881.25

256 Kbps

1500.00

1762.50

512 Kbps

2500.00

2937.50

1 Mbps

Not available for New Supply

Not available for New Supply

2 Mbps

Price on Application

Price on Application

2 Mbps Secure Plus

Price on Application

Price on Application

Connection to a single VPN is included within the Connection Charge. Charges for additional VPN Connections are listed in `VPN Service Charges'.

From 8th January 2007 the products below will not be available for new supply. New distance based prices for 34M and 155M are available on application.

Flat Rate High Bandwidth IP Clear - NOT AVAILABLE FOR NEW SUPPLY, please see later in this Part `Distance Based Services.

1Mbps IP Clear is no longer available for new supply from 23rd March 2009





Access Connection Bandwidth

Site Connection Charge (a)

Exc VAT

Inc VAT

£

£

34 Mbps Standard

20000.00(e)

23500.00(e)

34 Mbps Secure

30000.00(e)

35250.00(e)

34 Mbps Secure Plus

60000.00(e)

70500.00(e)

155 Mbps Secure

50000.00(e)

58750.00(e)

155 Mbps Secure Plus

100000.00(e)

117500.00(e)

Leadtimes

The standard leadtime for delivery of IP Clear accesses is:

128kb/s - 2Mb/s - 35 Working Days.

2Mb/s Secure Plus - 35 Working Days.

34Mb/s - 155Mb/s - 65 Working Days.

Orders of more than 5 Access Connections at once have to be arranged as a project and standard leadtimes do not apply.

Annual Rental Charges





Access Connection Bandwidth



Site Annual Rental

Out of Area Annual Rental Charge

for each km over 40km from nearest IP Clear Service Point

Exc VAT

Inc VAT

Exc VAT

Inc VAT

£(pa)

£(pa)

£(pa)/km

£(pa)/km

128 Kbps

4400.00

5170.00

20.00

23.50

256 Kbps

5500.00

6462.50

30.00

35.25

512 Kbps

8500.00

9987.50

60.00

70.50

1 Mbps (Not available for New Supply)

11000.00

12925.00

80.00

94.00

2 Mbps

Price on Application

Price on Application

Price on Application

Price on Application

2 Mbps Secure Plus

Price on Application

Price on Application

Price on Application

Price on Application

Note : On any resilient service COS values must be symmetrical on each access.

From 8th January 2007 the products below will not be available for new supply. New Distance Based Prices are available on application.

Flat Rate High Bandwidth IP Clear - NOT AVAILABLE FOR NEW SUPPLY, please see later in this Part `Distance Based Services.





Access Connection Bandwidth



Site Annual Rental

Out of Area Annual Rental Charge

for each km over 40km from nearest IP Clear Service Point

Exc VAT

Inc VAT

Exc VAT

Inc VAT

£(pa)

£(pa)

£(pa)/km

£(pa)/km

34 Mbps Standard

67000.00(e)

78725.00(e)

500.00(e)

587.50(e)

34 Mbps Secure

80000.00(e)

94000.00(e)

1000.00(e)

1175.00(e)

34 Mbps Secure Plus

145000.00(e)

170375.00(e)

1000.00(e)

1175.00(e)

155 Mbps Secure

245000.00(e)

287875.00(e)

2000.00(e)

2350.00(e)

155 Mbps Secure Plus

480000.00(e)

564000.00(e)

2500.00(e)

2937.50(e)

Upgrades/Downgrades in Resilience Options.

Charges for moving from a Standard Product to a Secure or Secure Plus product is the difference in connection charges, for example:

Rental will be re-calculated based on new access speed and resilience type (see tables above)

When a Customer wishes to move from 34Mbit/s to 100Mbit/s Flex, the upgrade charge will be the 100Mbit/s Flex Connection Charge less 40%. In addition, Customers must commit to move to 35Mbit/s or more and it will not be possible to regrade to any bandwidth lower than 35Mbit/s for the duration of the Contract Term for that Access Connection.

Downgrade of an Access Connection option is not allowed during the first 12 months after installation.

Resilience Downgrades are deemed to be when a customer moves to a lower form of Resilience for example: 2M Secure Plus downgrading to 2M Standard.

Downgrades are priced at the full connection charge for the new service and rentals will be adjusted accordingly to reflect the change in access connection.

A move to a lower speed is deemed as a downgrade and is charged at the full connection charge.

Regrade Charges

Customers may regrade between any of the IP Clear Access Connection options.

Upgrades

Change of Access speed up to 512K is charged at the difference in connection charges, however anybody upgrading to 2M from 128K, 256K or 512K will attract the full connection charge (£3000.00(Exc. VAT)).

Upgrades may be requested at any time and rentals will be re-calculated following the upgrade.

Upgrades are deemed to be the change of IP Clear service from a lower to a higher priced Access Connection.

The upgrade charge will be the difference between the 100Mbit/s Flex and Gigabit Ethernet Connection Charges and the Customer must commit to 40Mbit/s or the bandwidth they were utilising on 100Mbit/s Flex (whichever is the higher) for the duration of the Contract Term for that Access Connection.

Downgrades

Downgrade of an Access Connection option is not allowed during the first 12 months after installation.

Downgrades are deemed to be the change of IP Clear service from a higher to a lower cost Access Connection.

Downgrades are priced at the full connection charge for the new service and rentals will be adjusted accordingly to reflect the change in access connection.

Shift Charges





Shift Type



Charges

Internal shifts (within the same building)

Network Timescale rates apply (See Section 15)

External Shifts (to the same or different Service Point)

Full service Connection Charges apply. Rentals for the new Access Connection will be re-calculated, if appropriate, following the shift

Ancillary Charges

Charges for infrastructure over and above standard requirements are given in BT Price List Section 45 Part These charges include work on internal trunking & traywork; breaking through walls; additional poles, ducts and cable; radio charges and miscellaneous non-standard or specially requested items.

Standby Power

See BT Price List Section 12 Part for charges.

Cancellation Charges

Customer orders for IP Clear will be taken as a project and managed accordingly with BT and the Customer working together to formulate a suitable agreed roll-out plan. Order placement can then be staggered according to the plan and Contractual Delivery Dates will apply (using the standard lead time of access circuits) unless a specific extension is agreed with the Customer.

The delivery of a circuit is timed to meet a Contractual Delivery Date (CDD). The Cancellation Charges raised reflect the amount of work undertaken and are calculated on the number of Working Days between the date the Customer requests cancellation and the CDD.

The Cancellation Charge is expressed as a percentage of the appropriate Connection Charge.

Customers should note that once delivered, Access Connections have a standard 12 month minimum term for which rental will be due.

The Customer must give the cancellation date in writing.

Access Connections Provided within 35 Working Days of Date of Order

This relates to the following circuit types: 128K, 256K, 512K, 1M and 2048K leased line delivery, also 2M Flex





Working Days before Contractual Delivery Date



% of Connection Charge

2 or less

90

3 - 19

75

20 - 25

60

26 - 30

30

Accesses Provided within 65 Working Days of Date of Order

This relates to 34M and 155M circuits





Working Days before Contractual Delivery Date



% of Connection Charge

10 or less

90

11 - 39

75

40 - 50

60

51 - 60

30

Cancellation charges will not be raised if a customer cancels an order;

  • -more than 30 Working Days before CDD for products with a standard lead-time within 35 Working Days of date of Order.
  • -more than 60 Working Days before CDD for products with a standard lead-time within 65 Working Days of date of Order.

Accesses Provided within 38 Working Days of Date of Order

This relates to the following circuit types: 10M, 100M and 1000M Flex



Working Days before Contractual Delivery Date

% of Connection Charge

10 or less

95

11 - 20

75

21 - 32

30

33 - 38

0

(i.e. one working week is allowed as a `cool off' period).

The full cost of all additional work, (e.g. duct) which is separately identified on the Customer Requirements Form (CRF) and which has been specifically incurred as a result of that order will be fully recovered. This is in addition to the Cancellation Charge.

Should the Customer request amendments to the CDD and subsequently cancel the order, the cancellation charge will be calculated from the date that the Customer notifies BT of the first amendment and the original CDD.

Contract Options

Term Contract Options

The minimum contract term is 12 months.

Customers may opt to enter into a 1, 3, 4 or 5 year Contract option. Prevailing rentals will be discounted for the duration of the contract according to the rates specified under the Unified Discount Scheme (Section 47 Part 3).

The term commitment and the spend across the contributing products provide an appropriate discount across all of the products. For further details of this matrix, refer to Part `Unified Discount Scheme' of this Section.

Refer to Unified Discount Scheme for details on early termination charges.

Spread Connection Charges - Not available for New Supply

Service Level Guarantee Scheme (SLG)

For details of the VPN Service Level Guarantee Scheme please see Section 47 Part 2 Sub-Part `SERVICE LEVEL GUARANTEE (SLG) SCHEME'.

Terms and Conditions

In the United Kingdom, IP Clear is provided under the BT Conditions for Virtual Private Network Services.